DFWHomework Sign in
Fort Worth, TX 76107 · Locke Ave · Chamberlain Arlington Hts 1St

5001 Locke Ave

Built 1947 · 1,024 sq ft
LOT 6,404 SQ FT · TAD 488704Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on DFWHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1947
Living area
1,024 sqft
Lot size
6,404 sqft
Home type
Single-family
Appraisal account
TAD 488704
County value
$240,756

Major systems

Pool
No
Garage
Carport (400 sqft)

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
HVACOn record 2020
Expected 2030 to 2035From the 2020 permit
20262035
Water heaterOn record 2011
Usually done by 2023From the 2011 permit
Electrical panelWorth a licensed review
Homes this age upgrade most often.Judged by home age, not a lifespan

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 204 homes on Locke Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2020
    permit on fileRoom addition: 10 X 27 Attached Covered Deck // Repermitting Work From Pb18-08245 // To Be Reviewed With Pb20-03531
  • 2020
    permit on fileKitchen: Interior And Exterior Remodel- Relocate 3 Windows, Change Window Size, Replace Exterior Doors, Replace Sheetrock As Needed, Remove Wall In Kitchen, Add Walls To Create Storage Closet And Expand Bathroom // Repermitting Work From Pb18-08246 // To Be Reviewed With Pb20-03530
  • 2020
    permit on fileElectrical: Electrical Work For A Residential Remodel
  • 2020
    permit on filePlumbing: Plumbing Permit
  • 2020
    permit on fileHeating & cooling: Mechanical Permit
  • 2019
    permit on file, unconfirmedHeating & cooling: Mechanical Permit
  • 2018
    permit on file, unconfirmedPlumbing: Plumbing Permit
  • 2018
    permit on file, unconfirmedRoom addition: Deck 10 X27 With Arbor Cover
  • 2018
    permit on file, unconfirmedKitchen: Interior Remodel/ Relocate 3 Windows/ Change Window Size/ Replace All Exterior Doors/ New Sheet Rock As Needed Throughout/ Remove Wall In Kitchen/ Add Walls To Create Storage Closet/Expand Bathroom
  • 2018
    permit on file, unconfirmedElectrical: Electrical Permit
  • 2012
    permit on file, unconfirmedElectrical: Electrical Permit
  • 2012
    permit on fileElectrical: Electrical Permit
  • 2011
    permit on fileWater heater: Installed Gas Water Heater, Water Re- Pipe 100 Ft, Installed Clean-Outs In Bakyard

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2023
  • 2030
    HVAC replacementExpected 2030 to 2035