DFWHomework Sign in
Fort Worth, TX 76120 · Aldra Dr · Ederville Park Townhomes Addn

1500 Aldra Dr

Built 2009 · 1,582 sq ft
LOT 7,086 SQ FT · TAD 41324951Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on DFWHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2009
Living area
1,582 sqft
Lot size
7,086 sqft
Home type
Single-family
Appraisal account
TAD 41324951
County value
$270,232

Major systems

Pool
No
Garage
Garage (360 sqft)

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
HVACWorth a look now
Usually done by 2024From build year 2009
Water heaterWorth a look now
Usually done by 2021From build year 2009

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 23 homes on Aldra Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedHeating & cooling: Mechanical Permit
  • 2026
    permit on file, unconfirmedGeneral remodel: 3-Ton Gas Level 1 Complete System 15-30 Amp 120/240 Volt Circuit Or Outlet Level 2 -Laundry Box Plus Piping
  • 2026
    permit on file, unconfirmedRoof: Fire-Damage Restoration Of The Existing Approximately 1,840-Square-Foot, Two-Story Residence. Work Includes Replacement Of Damaged Roofing And Roof Decking; Repair Of Damaged Load-Bearing And Non-Load-Bearing Wall Framing, Attic Flooring, And Second-Floor Subfloor; Replacement Of Electrical Wiring
  • 2026
    permit on file, unconfirmedElectrical: Electrical Permit
  • 2009
    permit on file, unconfirmedElectrical: Installation

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2021
  • Now
    HVAC replacementUsually done by 2024