DFWHomework Sign in
Fort Worth, TX 76123 · Rush River Tr · Summer Creek Ranch Addition

4649 Rush River Tr

Built 2006 · 3,625 sq ft
LOT 10,331 SQ FT · TAD 40494500Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on DFWHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2006
Living area
3,625 sqft
Lot size
10,331 sqft
Home type
Single-family
Appraisal account
TAD 40494500
County value
$482,757

Major systems

Pool
No
Garage
Garage (640 sqft)

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
HVACWorth a look now
Usually done by 2021From build year 2006
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 61 homes on Rush River Tr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedGeneral remodel: Installing 4 Sliding Glass Door And One Door To Enclose Patio
  • 2017
    permit on file, unconfirmedSolar: Install 37 Roof-Mounted Solar Panels For A 9.62 Kw Pv System.
  • 2017
    permit on file, unconfirmedElectrical: Electrical Permit
  • 2016
    permit on fileSolar: Install 42 Roof Mounted Panels Of A 10.92 Kw Solar Pv System
  • 2016
    permit on fileElectrical: Electrical Permit
  • 2014
    permit on file, unconfirmedPlumbing: Plumbing Permit

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2021